SAP High Availability


What Is High Availability?

High availability (HA) is the ability of a system to operate continuously without failing for a designated period of time. HA ensures a system meets an agreed-upon operational performance level. Availability is expressed as a percentage:

  • 99% = 87.6 hours of annual downtime
  • 9% = 8.76 hours of annual downtime
  • 99% = 52 minutes of annual downtime
  • 999% = 5 minutes of annual downtime.

High availability usually equals 99.999% or better. HA is achieved by eliminating single points of failure and providing the ability to rapidly resume operations after a system outage with minimal business loss.

What Is SAP High Availability?

SAP has put in place plans and procedures that enable SAP ERP and other critical systems to keep on running. A high-availability solution for SAP needs to achieve four core goals:

  • Minimize downtime
  • Eliminate data loss
  • Maintain data integrity
  • Enable flexible configuration.

For example, SAP offers the Standalone Enqueue Server 2 (ENSA2) as a component of Application Server ABAP to provide high availability. It supports two-node and multi-node clusters, which enables switchover to ENSA2 to ensure continued system availability. In addition, SAP High Availability Failover enables SAP Adaptive Server Enterprise (SAP ASE) to work in a cluster of servers in a specific configuration, enabling failover and failback on servers.

Further Resources for SAPinsiders

SAP High Availability Best Practices in AWS. In this webinar, Brett Barwick, Senior Software Engineer of SIOS Technology Corp., and Tamara Astakhov, Senior Partner, Solution Architect for Big Data & Analytics, AWS, discuss best practices for SAP high availability and how to achieve near-zero downtime.

The 15 Most Overlooked Items in Planning for High Availability and Disaster Recovery. In this article, Kurt Bishop, a retired member of SAP America’s Technical Consulting Team, offers advice on how to avoid costly mistakes by sharing the 15 most overlooked items — including the cost of downtime, security issues, loss of personnel and systems, and the importance of testing — and discussing how to incorporate them into recovery planning.

Architecting a High Availability SAP NetWeaver Infrastructure: Strategies for Ensuring a Successful, Cost-Effective Implementation. In this article, Matt Kangas, U.S. Product Manager for SAP NetWeaver Application Server at SAP Labs, provides an overview of HA basics and then discusses the technical details of an HA setup with SAP NetWeaver, including topics such as architectural single points of failure and ways to isolate and protect such failure points.

Vendors that can assist SAP customers with high availability include: AWS, Google Cloud, Microsoft, Managecore, Red Hat, Saberpoint, SIOS, SUSE, Virtustream, and Zebra Technologies.

1301 results

  1. Build an Effective Interface for Your Employee Screening

    Published: 15/January/2009

    Reading time: 14 mins

    See a two-phased process to build an interface between your SAP ERP HCM and SAP GRC Global Trade Services systems. By setting up communication between the two systems and using Application Link Enabling to transfer the data, you can improve your employee screening in SAP ERP HCM. Key Concept Application Link Enabling (ALE) is a...…

  2. Warehouse Management: Deploy Successful Placement Strategies

    Published: 01/December/2005

    Reading time: 14 mins

    By understanding and leveraging all the Warehouse Management (WM) tools SAP provides, you can satisfy even your most complex placement requirements. Here’s how to get started. Key Concept SAP’s Warehouse Management (WM) module provides extensive placement strategies, which you can configure to meet a wide variety of needs. SAP WM has the ability to be...…

  3. Make the Most of APO

    Published: 01/August/2004

    Reading time: 47 mins

    The ability to produce fast, accurate APO Demand Planning (DP) reports requires close collaboration between the APO and BW teams. You want to optimize the data flow between DP and BW, and the advice and best practices presented here will help you achieve this goal. Key Concept Demand Planning (DP) is the tool used within...…

  4. Demystify Safety Stock Calculation Methods in PP/DS

    Published: 01/December/2003

    Reading time: 13 mins

    Subtle differences in the way SAP APO SNP and the Production Planning and Detailed Scheduling (PP/DS) applications calculate safety stock are often a source of confusion. Gain an understanding of these differences and see how you use the SAP safety stock methods in PP/DS. In most cases, the safety stock calculation methods in the SAP...…

  5. Critical Tips for Integrating Personnel Planning and Structural Authorizations

    Published: 15/April/2010

    Reading time: 13 mins

    Learn the importance of the connection between personnel planning functions and structural authorizations through these integration tips. Key Concept Personnel planning is the authorization object PLOG, which is included in general authorizations (roles). Personnel planning is used for checking authorizations for specific fields in the Personnel Management components (Organizational Management, Personnel Development, Training and Event...…

  6. Use Data Federator for Relational Universes on Top of SAP NetWeaver BW

    Published: 14/May/2010

    Reading time: 17 mins

    Find out how to install and configure SAP BusinessObjects Data Federator with SAP NetWeaver Business Warehouse (SAP NetWeaver BW). Then discover how to create relational universes based on your SAP NetWeaver BW InfoProviders, such as an InfoCube. Key Concept With SAP BusinessObjects Data Federator XI 3.1, you can create a relational universe based on your...…

  7. Nifty User Options to Customize Your Screen

    Published: 15/November/2007

    Reading time: 14 mins

    Explore several options to customize screen layouts that meet your business needs. Save time navigating and populating frequently used transactions in your SAP system. Key Concept The customizing of local layout icon is a standard icon that appears at the top of every SAP screen in R/3 4.6C and SAP ERP Central Component. Several user...…

  8. 10 Tips for Your SAP HR Payroll Rollout to Germany

    Published: 15/October/2007

    Reading time: 13 mins

    10 points illustrate the complexity and nature of German payroll and help you prepare for a successful rollout. Key Concept Unlike some US organizations, companies in Germany and many other European countries see payroll as a part of the HR module rather than the accounting department. This usually leads to a high level of integration...…

  9. Create and Monitor a Risk-Adjusted Strategy for the Post-Crisis Economy

    Published: 07/January/2010

    Reading time: 10 mins

    As part of its positioning for the corporate boardroom set of enterprise performance management applications, SAP BusinessObjects Strategy Management enables decision makers to access what is happening in real time in the organization, while leveraging any existing back-office enterprise software investments. Learn how to address risk in the development of go-forward strategies in the post-crisis...…

  10. Dodd-Frank Act: Standardize Risk Management Processes with SAP BusinessObjects Risk Management 10.0

    Published: 19/April/2011

    Reading time: 17 mins

    Ensure that your enterprise’s risk management procedures comply with the Dodd-Frank Act’s requirements pertaining to the management of systemic risks by using SAP BusinessObjects Risk Management 10.0. It supports the five phases of risk management. Key Concept The Dodd-Frank Act was signed into law in July 2010 in response to the 2007 US financial crisis....…