Realize a Faster Design Build by Procuring Components without Building the Assemblies

Realize a Faster Design Build by Procuring Components without Building the Assemblies

Published: 08/January/2014

Reading time: 10 mins

SCMProcuring components without building assembly production orders is a common requirement for creating product prototypes. You can meet this demand by creating a forecast for the assembly material and running material requirements planning (MRP). Discover the material master settings to use and walk through a test procedure for verifying the functionality. Key Concept Planning without...

This content is for Mastering SAP Premium Access and Mastering SAP Preferred Access members only.
Log In Join Now

More Resources